(s)earch

Frame progress

blg_frame

A little while ago I posted a picture of my frame when I originally stripped it down. Since then my friend Dave has been working on cleaning up the frame for me by stripping the paint and grinding down some of the superfluous parts (shifter mounts, cable guides, derailleur hanger etc). I went over to his place tonight to check out the progress and so far and it’s looking super good. Here’s a process shot of the dropouts with the derailleur hanger and rack mounts ground off. There’s still a little bit of paint on the frame but it should be ready to go soon. Hit the jump for a picture of the whole frame after the jump.

blg_frame2